ALTA Survey Review
SI-Powered
Upload & Configure
86
Checklist items
Proofle reviews ALTA/NSPS surveys against the complete 2026 checklist in minutes. Flags certification errors, Schedule B gaps, and drawing-face issues for your review, on every draft.
1–5
minutes, typically
2026
ALTA/NSPS standards
1
Survey Documents
Upload the required documents to begin the review.
Draft Survey PDF
Required
The draft survey drawing to review
Drag & drop a PDF here or click to browsePDF format only
Title Commitment PDF
Optional
Enables Schedule B cross-check
Drag & drop a PDF here or click to browsePDF format only
We do not retain your Documents. Your uploads are never used to train or improve SI models. We do not sell your data. Privacy Policy
Tip: ask the surveyor to export the PDF with a text layer. Some CAD exports come out as a flat image with no text layer, the same as a scan, and small text on an image can be missed. A PDF with a text layer gives the most complete review.
Additional Reference Documents
Schedule B exhibits, zoning reports, prior surveys, easement documents, or any other reference PDFs. Attach the zoning report (PZR) and mark it as such: the review then checks the zoning classification, setbacks and parking against it.
2
Project Information
Enter the project details and select the Table A items in scope.
Best: check the Table A items from your contract or the commitment. If you leave them blank, the review reads the list from the survey’s certification, and the report says where it came from, or that it could not be read.
Runs the full checklist and checks the survey against every document you attach. Usually one to five minutes; large surveys take longer.
You are running a first-pass checklist. The surveyor's certification and your own review remain the final review.
About Proofle
✓
What Proofle does

Proofle reviews ALTA/NSPS land title surveys against the complete 2026 ALTA/NSPS Minimum Standard Detail Requirements — an 86-item checklist covering certification, boundary, streets, notes, encroachments, and all Table A items in scope.

When a title commitment is provided, Proofle cross-references Schedule B exceptions, checks the legal description against the commitment, and checks commitment numbers, effective dates, and certification entities against the survey — the most error-prone part of the review process. Upload a survey PDF, provide project metadata, and Proofle returns a structured first-pass report, usually in one to five minutes; large surveys take longer. Results are categorized as FAIL, RECOMMEND, PASS, or N/A based on scope, the same four the Civil 3D plug-in reports.

The most commonly missed items on survey drafts: certification block errors, missing surveyor email, assurance note issues, street numbers absent from the drawing face, and Schedule B items listed without a required disposition. Proofle checks all of these on every submission — consistently, regardless of surveyor or office.

i
How it works
86
Checklist items
1–5
minutes, typically
2026
ALTA/NSPS standard

Proofle flags for your review missing certification entities, Schedule B deficiencies, drawing-face labeling issues, and title commitment cross-reference failures. The review methodology is proprietary, developed from real production survey corrections, and continuously validated against a reviewer-adjudicated benchmark dataset.

2004
Earliest corrected survey
80,000+
Documented reviewer corrections
◈
Why it works — and why it keeps getting better

Proofle's evaluation methodology was built from actual correction findings made by experienced human reviewers on real production surveys dating back to 2004 — the specific, documented reasons surveys failed review. That record exists only because a working commercial due-diligence firm, in business since 2003, adjudicated real surveys, item by item.

The failure-pattern expertise that record encodes — which requirements are routinely misunderstood, which vary by state, which are most likely to be wrong on a draft, and what correct looks like across thousands of real examples — is largely independent of any single standard revision; surveys fail for the same human reasons year over year. Proofle applies that expertise against the current 2026 ALTA/NSPS Minimum Standard Detail Requirements.

The methodology is continuously validated against our reviewer-adjudicated benchmark dataset and refined as the standard and review practice evolve. It doesn't stand still.

!
Intended use & limitations

Proofle is a professional aid, not a replacement for licensed surveyor judgment. It is designed to flag the most common survey draft deficiencies and focus reviewer attention — not to make the final determination on survey acceptability.

All findings must be verified by a qualified professional before action is taken or corrections are transmitted to the surveyor.

Proofle  ·  proofle.com
2026 ALTA/NSPS Land Title Survey Minimum Standard Detail Requirements